MARY 3 COMBINED CYCLE POWER PLANT
HRSG Erection, bop Piping, Mechanical works.
All mechanical works of admin building in the power plant.
90.000 WDI BOP piping of the power plant project
Mechanical works for S146,7 MW Simple Cycle Gas Turbine Power Plant of Auxiliary Facilities
GARABOGAZ AMMONIA AND UREA PRODUCTION
70.000 WDI Aboveground piping works of ammonia and urea plant
Underground and aboveground piping, FRP piping, Tank manufacturing and erection, HVAC and plumbing
ALCOMET – ALUMINUM ROLLING MILL
The main contractor for civil engineering works, including earthworks and piling works
MD Electronics Office and Factory
The main construction works of the project.
SAUDIA AIRLINES CATERING BUILDING
Mechanical, electrical, and sanitary plumbing works for the food processing facility and the construction of cold storage rooms for meals to be served to passengers during flights by the airline company.
MIRANLI TEXTILE FACTORY
Mechanical works for the Miranlı Yarn Factory, with a total indoor area of 35,000 m². The scope includes the climate control of texturing processes, the compressor plant, the fire suppression system, the water treatment plant, and the mechanical works for the administrative buildings.
PAŞABAHÇE KIRKLARELİ WAREHOUSE FIRE DETECTION AND PROTECTION PROJECT
Installation of fire detection and firefighting systems at the Paşabahçe company's Kırklareli warehouse building
TRAKYACAM POLATLI FACTORY TR07 LINE PROCESSING OPERATIONS
Process conditioning of glass manufacturing factory with special duct constructions for airflow redirections.