NAVOI-2 COMBINED HEAT AND POWER PLANT
Design, manufacturing, and erection of 9 cylindrical and 1 prismatic storage tanks.
TURKMENBAŞI PORT PROJECT
All mechanical works for a total of 28 buildings, including offices and warehouses. A total of 28 reinforced concrete and steel structure buildings. Mechanical Works 27,000 m Technical Gas System Natural Gas System 50 Ton Steel Structure HVAC, Fire Protection...
MARY 3 COMBINED CYCLE POWER PLANT
HRSG Erection, bop Piping, Mechanical works.
All mechanical works of admin building in the power plant.
90.000 WDI BOP piping of the power plant project
Mechanical works for S146,7 MW Simple Cycle Gas Turbine Power Plant of Auxiliary Facilities
EMAAR SQUARE SHOPPING CENTER & PARKING LOT
All mechanical and electrical works of shoppping mall and carpark. Total indoor area of 600.000 m²
MEDINA CITY MUHAMMED BIN ABDULAZIZ INTERNATIONAL AIRPORT
All mechanical works of airport with total indoor area 200.000m².
Mechanical management of facility until 2021
ACIBADEM ATAŞEHİR HOSPITAL AND OFFICE PROJECT
Mobilization and infrastructure works for the hospital building
ASHGABAT MORPHOLOGY CENTER
This hospital with 27.000 m² indoor area and 3.100 kW cooling load has been designed to fit the World Health Organisation criteria.
ÇALIK HOLDING TURKMENISTAN HEADQUARTERS BUILDING
This 10.600 m² building will house companies within Çalik Holding such as Çalik Enerji, GAP İnşaat ve GAP Pazarlama. Total cooling load is 1.500 kW. This project was completed in a short period of 6 months.
MIRANLI TEXTILE FACTORY
Mechanical works for the Miranlı Yarn Factory, with a total indoor area of 35,000 m². The scope includes the climate control of texturing processes, the compressor plant, the fire suppression system, the water treatment plant, and the mechanical works for the administrative buildings.
JEDDAH KING ABDULAZIZ INTERNATIONAL AIRPORT MAINTENANCE HANGARS
Pre-insulated cold water pipes, Jet fuel pipes, Jet fuel pipes