LUCID ELECTRIC CAR FACTORY
All Mechanical, Electrical, and Plumbing (MEP) work in the General Assembly and Quality Control Building (GAQ) of the electric vehicle factory.
RIYADH KING HALED INTERNATIONAL AIRPORT T1-T2 TERMINALS
MEP works of 2 terminals and link buildings while the airport was in operation. Total indoor area of 165.000 m²
RIYADH METRO LINE 3
Mechanical, electrical, and plumbing (MEP) works for the New Riyadh Metro Line 3, including the main terminal building.
TAIBAH UNIVERSITY COOLING PLANT AND ENERGY CENTER
Electromechanical works for the university's cooling facility and energy center, which houses 14 cooling units. Scope includes all cooling units, circulation pumps, fire pumps, switchgear, generators, MCC and DDC panels...
RED SEA INTERNATIONAL AIRPORT AIR TAXI TERMINAL
Mechanical, electrical, and plumbing (MEP) works for the 7,300 m² terminal building as part of the New Red Sea Project.
RIYADH KING HALED INTERNATIONAL AIRPORT T3-T4 TERMINALS
While the airport was operational, mechanical, electrical, and plumbing (MEP) work was carried out on two terminals and connecting buildings. The total indoor area is 125.000 m².
MEDINE MILLENNIUM HOTEL
Mechanical, electrical, and plumbing works at the airport hotel in Medina Airport
SAUDIA AIRLINES CATERING BUILDING
Mechanical, electrical, and sanitary plumbing works for the food processing facility and the construction of cold storage rooms for meals to be served to passengers during flights by the airline company.
MEDINA CITY MUHAMMED BIN ABDULAZIZ INTERNATIONAL AIRPORT
All mechanical works of airport with total indoor area 200.000m².
Mechanical management of facility until 2021
JEDDAH KING ABDULAZIZ INTERNATIONAL AIRPORT MAINTENANCE HANGARS
Pre-insulated cold water pipes, Jet fuel pipes, Jet fuel pipes













