Sönmez GlobalSönmez Global
Sönmez GlobalSönmez Global
Archives

TURKMENISTAN

ASHGABAT MORPHOLOGY CENTER

This hospital with 27.000 m² indoor area and 3.100 kW cooling load has been designed to fit the World Health Organisation criteria. 

ÇALIK HOLDING TURKMENISTAN HEADQUARTERS BUILDING

This 10.600 m² building will house companies within Çalik Holding such as Çalik Enerji, GAP İnşaat ve GAP Pazarlama. Total cooling load is 1.500 kW. This project was completed in a short period of 6 months.

ASHGABAT CARDIOLOGY HOSPITAL

This 120 bed hospital has 4.000 kW of cooling capacity with 3 chillers serving the building.

ASHGABAT EDUCATION AND SCIENCE RESEARCH CENTER

It covers an area of approximately 21,000 m². The center, which facilitates joint projects with scientific institutions such as TÜBİTAK, the Fraunhofer Institute, and the Max Planck Institute, brings Turkmen doctors and Turkmenistan's medical research up to world standards.

ASHGABAT NEUROLOGY HOSPITAL

This 3 building hospital with 120 bed capacity and 2.500 kW cooling load has been designed to fit the World Health Organisation criteria. 

ASHGABAT CENTER FOR PREVENTION OF DANGEROUS INFECTIONS

1.400 kW cooling load has been constructed to fit the World Health Organisation criteria.

ASHGABAT EPIDEMIOLOGY HOSPITAL

The 2,700 kW cooling load is constructed in accordance with World Health Organization criteria.

DERWEZE OFFICES

Mechanical works of Derweze Power Plant administration and control center offices.

ASHGABAT SCADA BUILDING

This building is part of the modernization of Ashgabat's electricity supply and controls the distribution of electricity throughout the city.