Procurement of Ship Unloading Cranes (GSU) for the ISDEMIR Port
Modernization of the Isdemir A1 (No. 1) port, its railways, and conveyor systems; design and procurement of two ship-unloading cranes, each with a capacity of 2,000 tons per hour.
Modernization of the Isdemir A1 (No. 1) port, its railways, and conveyor systems; design and procurement of two ship-unloading cranes, each with a capacity of 2,000 tons per hour.
What are you looking for?