Projects

MEP

LUCID ELECTRIC CAR FACTORY

Mechanical, Electrical and Plumbing (MEP) works in the General Assembly and Quality Control Building (GAQ) of the electric vehicle factory.

RIYADH KING HALED INTERNATIONAL AIRPORT T1-T2 TERMINALS

MEP works of 2 terminals and link buildings while the airport was in operation. Total indoor area of 165.000 m²

RIYADH METRO LINE 3

Mechanical, electrical, and plumbing (MEP) works for the New Riyadh Metro Line 3, including the main terminal building.

ANTALYA AIRPORT

1) Antalya Airport Expansion and Improvement Project Terminal-1 Heating Center (IM1), Terminal-2 Expansion Energy Building (IM3), and New Energy Center (KS3) Mechanical, Electrical, and Plumbing Works 2) Antalya Airport...

TAIBAH UNIVERSITY COOLING PLANT AND ENERGY CENTER

Electromechanical works for the university's cooling facility and energy center, which houses 14 cooling units. Scope includes all cooling units, circulation pumps, fire pumps, switchgear, generators, MCC and DDC panels...

RED SEA INTERNATIONAL AIRPORT AIR TAXI TERMINAL

Mechanical, electrical, and plumbing (MEP) works for the 7,300 m² terminal building as part of the New Red Sea Project.

RIYADH KING HALED INTERNATIONAL AIRPORT T3-T4 TERMINALS

While the airport was operational, mechanical, electrical, and plumbing (MEP) work was carried out on two terminals and connecting buildings. The total indoor area is 125.000 m².

HAMAD INTERNATIONAL AIRPORT

MEP Works of International Airport during the pandemic to accommodate the passengers arriving for the FIFA World Cup