TURKMENBAŞI ONSHORE GAS TERMINAL
Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.
SAPANCA LAKE – YUVACIK WASTEWATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS
Installation of 21 km of 1,300 mm diameter pipe, construction of a pump station, construction of a water reservoir with a capacity of 2,000 m³ and a flow rate of 600 l/s, water intake structure, supply of a 1,250 kW pump, and...
EURASIA UNIVERSITY
Heating, ventilation, plumbing, fire suppression, building management system (BMS), compressed air systems. Total indoor area 20,000 m² (Mechanical and Electrical Works).
TRAKYA CASTING INC. NEW OFFICE BUILDING
Heating, ventilation, plumbing, fire protection, building management system (BMS) installations, electrical work. Total indoor area 24,000 m².