Sönmez GlobalSönmez Global
Sönmez GlobalSönmez Global
Project

SAPANCA LAKE – YUVACIK WASTEWATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS

Year:

Location:

Function:

Installation of 21 km of 1.300 mm diameter pipes, contruction of pumping station, construction of water tank with the capacity of 2.000m³ & 600 l/s, water intake structure, supply and installation of 1.250 kW pump (Mechanical and Electrical Works)