DENTAL HOSPITAL
Mechanical installation work for the hospital with a total indoor area of 12,850 m²
Ashgabat Eye Hospital
Mechanical installation works for a specialized Ophthalmology hospital with a total enclosed area of 15,000 m².
TURKMENBAŞI ONSHORE GAS TERMINAL
Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.
AKASYA RESIDENCES
All mechanical work for apartments, residences, and parking lots. Total indoor area: 97,000 m².









