ASAS ALUMINUM PRODUCTION FACILITY EXPANSION
Heating, cooling and processing works of electroliquid tanks (90-70 heating installations, superheated water cooling,compressed air and process installations)
PALLADIUM SHOPPING MALL & RESIDENCES
Mechanical works of shopping center, carpark and residance buildings. Total indoor area of 20.000 m²
SAPANCA LAKE – YUVACIK WASTEWATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS
Installation of 21 km of 1,300 mm diameter pipe, construction of a pump station, construction of a water reservoir with a capacity of 2,000 m³ and a flow rate of 600 l/s, water intake structure, supply of a 1,250 kW pump, and...
TRUMP SHOPPING MALL AND PARKING LOT
Project consist of a 62.000 m² shopping mall and a carpark with the capacity of 1000 cars.
POAŞ TERMINAL FACILITIES (KOCAELİ/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ANTALYA/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ISTANBUL/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (IZMIR/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ERZURUM/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
Installment Center Shopping Center
Air Conditioning, Heating, Cooling, Fire Suppression System, Building Automation, Natural Gas.