Status: Ongoing

Location: Muğla/ Türkiye

Year: 2024

Scope: Mechanical Contracting

  • Plumbing
  • Firefighting
  • HVAC
  • Natural Gas
  • BMS

 

Gülsan İnşaat Sanayi Turizm Nakliyat Ve Ticaret A.Ş.

IS BANKASI MARMARİS TRAINING AND RETREAT CENTER

Mechanical Works of 35.000 mtraining and retreat facility

Status: Ongoing

Location: Riyadh / Saudi Arabia

Year: 2025

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

JOINT VENTURE OF AL RASHID TRADING AND CONTRACTING COMPANY AND IC ICTAS SAUDI ARABIA LIMITED

RIYADH KING KHALED INTERNATIONAL AIRPORT T1-2 TERMINALS

All MEP works of King Khaled International Airport Terminal 1 and Terminal 2 along with the linking buildings, in Riyadh, the capital of the Kingdom of Saudi Arabia.

Status: Completed

Location: Almaty / Kazakhstan

Year: 2024

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TAV CONSTRUCTION

ALMATY INTERNATIONAL AIRPORT

All MEP works of 56.000 m2 airport project.

Status: Completed

Location: Tekirdağ / Türkiye

Year: 2024

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

Telasis Tekstil Ürünleri San. ve Tic. A.Ş.

TELASİS TEKSTİL

General Contracting works of 35.000 m2 factory building including manufacturing facility, warehouse, offices. 

Status: Ongoing

Location: Istanbul/ Türkiye

Year: 2024

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting

 

   

Cengiz-Kolin-Kalyon-Özgün Yapı İstanbul Yeni Havalimanı - Halkalı Metro Hattı Yapım Ortaklığı

HALKALI - ISTANBUL NEW AIRPORT METRO LINE

Mechanical works of 3 metro stations in the European side of Istanbul, at the Olympic Stadium and surrounding neighborhoods.

Status: Completed

Location: Plovdiv / Bulgaria

Year: 2023

Scope: General Contracting

BALKAN AGRICULTURAL LTD.

PLOVDIV COLD STORAGE BUILDING

All contracting works of cold storage building for food storage.

Status: Ongoing

Location: Antalya/ Türkiye

Year: 2024

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

TAV Construction & Sera Construction Joint Venture

ANTALYA INTERNATIONAL AIRPORT

MEP works of Antalya Airport Terminal-2 and Central Utility Plants

Status: Ongoing

Location: Rufisque / Senegal

Year: 2024

Scope:

  • Manufacturing and Installation of Tanks (580 tons of steel structure)
  • 65.000 WDI BOP Piping

 

ÇALIK ENERJİ

CAP DES BICHES POWER PLANT

Tank manufacturing and BOP piping works of 300 MW Combined Cycle Power Plant in Senegal

Status: Ongoing

Location: Hatay / Türkiye

Year: 2024

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

İskenderun Demir ve Çelik A.Ş

ISDEMIR PORT CRANE RENEWAL PROJECT

Crane renewal project in Southern Turkey at one of the busiest ports in the country. 

Status: Completed

Location: Umluj/ Saudi Arabia

Year: 2023

Scope: General Contracting

        

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

MASAH Specialized Construction

RED SEA INTERNATIONAL AIRPORT - AIR TAXI TERMINAL

MEP works of Air Taxi Terminal Package of Red Sea International Airport including;

Terminal Building

Electrical Substation

Mechanical Utilities Building

Fuel Tank Building

GY - Generator Yard

Utilities Building

Status: Completed

Location: Istanbul/ Türkiye

Year: 2023

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting

 

   

Cengiz-Kolin-Kalyon Yapı İstanbul Yeni Havalimanı - Gayrettepe Metro Hattı Yapım Ortaklığı

GAYRETTEPE- ISTANBUL NEW AIRPORT METRO LINE

Mechanical works of 3 metro stations in the European side of Istanbul extending from Gayrettepe to the New Airport.

Status: Completed

Location: Istanbul/ Türkiye

Year: 2022

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

   

PELSAN TEKSTİL

PELSAN TEXTILE FACTORY

General contracting works of Pelsan Textile Factory in Tekirdag.

Status: Completed

Location: İstanbul / Türkiye

Year: 2023

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

TAKSIM 360

Office, residential and commercial areas and carpark of lots 360-361-362-363-385-386-387

Status: Completed

Location: Lörrach / Germany

Year: 2022

Scope: General Contracting

MONDELEZ INTERNATIONAL

CHOCOLATE FACTORY SUGAR SILOS

Renewal of sugar silo buildings in operational chocolate factory

Status: Completed

Location: Doha / Qatar

Year: 2022

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

The joint venture of Midmac Contracting, TAV Tepe Akfen Investment Construction and Taisei Corporation (MTT)

HAMAD INTERNATIONAL AIRPORT

All MEP works of Doha Hamad International Airport Expansion Project Package 13

Status: Completed

Location: Mersin / Türkiye

Year: 2023

Scope: MEP

Sera Construction

SISECAM BRINE PRODUCTION FACILITY

MEP works of Brine Production Plant

Status: Completed

Location: Riyadh / Saudi Arabia

Year: 2022

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

JOINT VENTURE OF AL RASHID TRADING AND CONTRACTING COMPANY AND IC ICTAS SAUDI ARABIA LIMITED

RIYADH KING KHALED INTERNATIONAL AIRPORT T3-4 TERMINALS

All MEP works of King Khaled International Airport Terminal 3 and Terminal 4 along with the linking buildings, in Riyadh, the capital of the Kingdom of Saudi Arabia.

Status: Completed

Location: İzmir / Türkiye

Year: 2020

Scope: Civil & Mechanical

 

TAV Construction

İZMİR ADNAN MENDERES AIRPORT

Removal and renewal of wastewater and stormwater system of operational airport

DÜNYA: TAMAMLANDI

Konum: İstanbul/ Türkiye

Yıl: 2020

Kapsam: MEP İşleri

  • Isıtma, havalandırma ve iklimlendirme
  • Sıhhi tesisat
  • İtfaiyecilik
  • BMS
  • Yüksek
  • MV

 

 

TAV SERA Adi Ortaklığı

EMAAR SQUARE ISTANBUL

Otel, Residence, Alışveriş Merkezi ve Otopark MEP İşleri. Toplam Toplam 1.000.000 m 2 kapalı alan

Status: Completed

Location: Kaakhka & Babadaijhan / Turkmenistan

Year: 2020

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

COTAM ENTERPRISES LTD

KAAKHKA & BABADAIJHAN TEXTILE FACTORIES

General Contracting works of 180.000 m2 factory buildings including manufacturing facility, warehouse, offices. 

Status: Completed

Location: Ashgabat / Turkmenistan

Year: 2020

Scope: MEP

  • Mechanical
    • Firefighting
    • HVAC
    • Plumbing
  • BMS
  • MCC

 

Bouygues Batiment International

ARKADAG HOTEL

MEP works of 90.000 m2 hotel in the capital city of Turkmenistan.

Status: Completed

Location: Ankara / Türkiye

Year: 2019

Scope: MEP

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

SERA YAPI ENDÜSTRİSİ VE TİCARET A.Ş.

TRAKYACAM POLATLI TR8 INVESTMENT PROJECT

MEP works of flat glass factory, process and distrubution networks, steel tanks

Status: Completed

Location: Kocaeli / Türkiye

Year: 2020

Scope: Mechanical works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • Process Piping

 

Mondelez International

MONDELEZ EMERALD PROJECT

Mechanical works of candy factory building

Status: Completed

Location: Manama Bahrain

Year: 2020

Scope: Mechanical Works

 

TAV Construction

BAHRAIN INTERNATIONAL AIRPORT MODERNIZATION PROJECT

220.000 m² new passenger terminal building, 130.000 m² carpark and 9.000 m² central utility complex with a total indoor construction area of 359.000 m². Total cooling load of the terminal will be 48.000 kW provided by 6 water cooled chillers.

Status: Completed

Location: Adana / Türkiye

Year: 2020

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • Textile Klimatization

 

SASA Polyester Sanayi A.Ş

SASA POY AND TEXTURIZED YARN PRODUCTION PLANT

Mechanical and textile klimatization works of textile factory

Status: Completed

Location: Turkmenbashi / Turkmenistan

Year: 2019

Scope: Restoration Works

CMI - John Cockerill

TURKMENBASHI POWER PLANT REVAMPING PROJECT

Restoration of boilers of operational facility

Status: Completed

Location: Ashgabat / Turkmenistan

Year: 2020

Scope: MEP Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

GAP İnşaat Yatırım ve Dış Ticaret A.Ş.

ASHGABAT BURN TREATMENT CENTER

This 130 bed capacity burn treatment center will have 4 operating theaters and 20 intensive care units. Our scope consists plumbing, HVAC, firefighting, BMS, natural gas installations and MCCs.

Status: Completed

Location: İstanbul / Türkiye

Year: 2019

Scope: Mechanical Contracting

  • HVAC
  • Firefighting
  • Plumbing
  • BMS

 

AKZİRVE Gayrimenkul ve Yatırım

STRADA BAHÇEŞEHİR

All mechanical works of 4 residential buildings and carparks

Status: Completed

Location: Kastamonu / Türkiye

Year: 2018

Scope: Mechanical Contracting

  • HVAC

 

Acacia Mining

GOKIRMAK COPPER MINE

HVAC works of offices for the mining operations

Status: Completed

Location: Askar / Bahrain

Year: 2019

Scope:

  • BOP
  • Mechanical Erection
  • Electrical Works

 

 

GAMA - GE JV

ALBA PS5 - COMBINED CYCLE POWER PLANT

BOP, Mechanical Erection and Electrical Works in the 1,792 megawatts (MW) Power Station 5.

Status: Completed

Location: Tashkent / Uzbekistan

Year: 2019

Scope: Mechanical Contracting

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

 

COTAM ENTERPRISES LTD

TASHKENT CITY IBC - HILTON HOTEL AND CONGRESS CENTER

88.000 m² Hilton Hotel and Convention Center project within the new Tashkent City International Business Center.

Status: Completed

Location: Medinah / Saudi Arabia

Year: 2019

Scope: MEP Contracting

 

SAUDI BIN LADIN GROUP

Rush Projects Division

TAIBAH UNIVERSITY CHILLER PLANT AND ENERGY CENTER

Electromechanical works of chiller plant and energy center of the university which house 14 chillers. Scope includes but not limited to the supply and installation of all chillers, circulation pumps, fire pumps, switchgears, generators, MCC and DDC panels.

Status: Completed

Location: Navoi/ Uzbekistan

Year: 2019

Scope: Tank Manufacturing and Erection

 

ÇALIK ENERJİ

NAVOI-2 COMBINED HEAT AND POWER PLANT

Design, manufacturing and installation works of 550 metric ton 9 cylindrical and 1 prismatic storage tanks.

Status: Completed

Location: Istanbul/ Türkiye

Year: 2019

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

 

 

Kalyon Holding

TEM TURKUVAZ MEDIA CENTER

All mechanical works of office blocks, tv studios, printing press facilities and carpark with total indoor area of 250.000 m²

Status: Completed

Location: Ashgabat / Turkmenistan

Year: 2020

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  •  

 

 

GAP İnşaat Yatırım ve Dış Ticaret A.Ş.

ASHGABAT ENDOCRYNOLOGY AND SURGERY HOSPITAL

Endocrynology hospital with 120 beds. 2 aircooled chillers provide 3.000 kW of cooling in total.

Surgery hospital with18 operating rooms and 180 beds. 3 aircooled chillers provide 4.050 kW of cooling in total. 

Status: Completed

Location: Ashgabat / Turkmenistan

Year: 2020

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

 

 

GAP İnşaat Yatırım ve Dış Ticaret A.Ş.

COSMOTOLOGY CENTER

Mechanical works of 12.000 m2 hospital

Status: Completed

Location: Ashgabat / Turkmenistan

Year: 2016

Scope: Mechanical Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  •  

 

 

GAP İnşaat Yatırım ve Dış Ticaret A.Ş.

CALIK HOLDING TURKMENISTAN HEADQUARTERS

This 10.600 m² building will house companies within Çalık Holding such as Çalık Enerji, GAP İnşaat ve GAP Pazarlama. Total cooling load is 1.500 kW. This project has been completed in a short period of 6 months.

Status: Completed

Location: Istanbul / Turkiye

Year: 2017

Scope: Mechanıc Works

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

 

 

ACIBADEM PROJECT MANAGEMENT

ACIBADEM ATASEHIR HOSPITAL AND OFFICE

Mobilization and underground piping works

Status: Completed

Location: Bursa/ Türkiye

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

HARPUT HOLDİNG

MIRANLI TEXTİLE FACTORY

Mechanical works of Miranlı Yarn Facility with total indoor area of 35.000 m². Scope includes the climatization of texturized processes, mechanical works of compressor plant, fire protection plant, water plant and administration buildings.

Status: Completed

Location: Turkmenbashı / Türkmenistan

Year: 2018

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

GAP İNŞAAT

TURKMENBASHI SEAPORT PROJECT

All mechanical works of 28 buildings, including offices, warehouses. 28 concrete and steel structure buildings in total

Status: Completed

Location: Jeddah / Saudi Arabia

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting

 

 

TAV TEPE AKFEN YATIRIM İNŞAAT VE İŞLETME A.Ş. – HALTON JV

JEDDAH KING ABDULAZIZ INTERNATIONAL AIRPORT MAINTENANCE HANGARS

Preinsulated chilled water piping, Jet Fuel piping, Jet fuel piping

Status: Completed

Location: Riyadh / Saudi Arabia

Year: 2018

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS

 

TAV TEPE AKFEN YATIRIM İNŞAAT VE İŞLETME AŞ.

RIYADH KING KHALED INTERNATIONAL AIRPORT T5 TERMINAL

Chiller Plant Mechanical Works

Status: Completed

Location: Garaboğaz / Türkmenistan

Year: 2018

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

GARABOGAZ AMMONIA AND UREA PRODUCTION

70.000 WDI Aboveground piping works of ammonia and urea plant
Underground and aboveground piping, FRP piiping, Tank manufacturing and erection, HVAC and plumbing

Status: Completed

Location: El Kassım / Saudi Arabia

Year: 2016

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

SULAIMAN AL RAJHI FOUNDATION

SULAIMAN AL RAJHI COLLEGES

General Contracting works.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2015

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

ÇALIK ENERJİ

ASHGABAT SCADA BUILDING

This building is a part of modernization of power supply for Ashgabat and controls the distribution of power throughout the city.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2025

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT CARDIOLOGY HOSPITAL

This 120 bed hospital has 4.000 kW of cooling capacity with 3 chillers serving the building.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT EDUCATION AND SCIENCE RESEARCH CENTER

All mechanical works. Total indoor area 21.000 m² 

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT MORPHOLOGY CENTER

This hospital with 27.000 m² indoor area and 3.100 kW cooling load has been designed to fit the World Health Organisation criteria. 

Status: Completed

Location: Ashgabat/ Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT NEUROLOGY HOSPITAL

This 3 building hospital with 120 bed capacity and 2.500 kW cooling load has been designed to fit the World Health Organisation criteria. 

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT DANGEROUS INFECTIONS PREVENTION CENTER

1.400 kW cooling load has been designed to fit the World Health Organisation criteria.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT COMMUNITY HEALTHCARE CENTER

2.700 kW cooling load has been designed to fit the World Health Organisation criteria.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2016

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT EPIDEMIOLOGY HOSPITAL

2.700 kW cooling load has been designed to fit the World Health Organisation criteria.

Status: Completed

Location: Mary / Türkmenistan

Year: 2018

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting

 

 

ÇALIK ENERJİ

MARY 3 COMBINED CYCLE POWER PLANT

HRSG Erection, bop Piping, Mechanical works.
All mechanical works of admin building in the power plant.
90.000 WDI BOP piping of the power plant project
Mechanical works for S146,7 MW Simple Cycle Gas Turbine Power Plant of Auxiliary Facilities

Status: Completed

Location: İstanbul / Türkiye

Year: 2025

Scope: MEP

  • Mechanical
  • Electrical

VARYAP & GAP İNŞAAT

METROPOL ISTANBUL

Mechanical and electrical works of residance buildings. Total indoor area of 180.000 m²

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT FIRST AID AND BALKANABAT EMERGENCY HOSPITAL

The contract consist of a 32.000 m² Emergency & First Aid Hospital in Ashgabat along with four Emergency Medical Centers located in Mary, Dasoguz, Turkmenabat and Balkanabat. With 230 bed capacity the hospital in Ashgabat is one of the largest in the country.

Status: Completed

Location: Medinah / Saudi Arabia

Year: 2017

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

TAV TEPE AKFEN YATIRIM İNŞAAT VE İŞLETME A.Ş.
TAV – AL RAJHI JV

MEDINAH PRINCE MOHAMMAD BIN ABDULAZIZ INTERNATIONAL AIRPORT

All mechanical works of airport with total indoor area 200.000m²

Status: Completed

Location: Istanbul / türkiye

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

BAYEGAN DIŞ TİCARET A.Ş.

 

BAYEGAN HEADQARTERS

ALL MECHANICAL WORKS

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

INFUSION SOLUTION PRODUCTION PLANT

Along with HVAC, plumbing, fire fighting and BMS works; the stainless steel process piping for steam was also in the scope of works.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

VAP RESIDENCE RESTORATION WORKS

All mechanical restoration works of the residences

Status: Completed

Location: Ashgabat/ Türkmenistan

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

TURKMENISTAN CABINET RESIDENCE - RESTORATION WORKS (TURKMENISTAN MINISTRY RESIDENCES)

All mechanical restoration works of the residences

Status: Completed

Location: Kocaeli / Türkiye

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting

ARK İNŞAAT SANAYİ VE TİCARET A.Ş.

KOCAELİ FORD OTOSAN B460 YENİKÖY FACTORY

All mechanical works of welding, assembly, painting and auxiliary buildings

Status: Completed

Location: Istanbul / Türkiye

Year: 2014

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

ÖZDİLEK ALIŞVERİŞ MERKEZLERİ VE TEKSTİL SAN. A.Ş.

ÖZDİLEK PARK MALL and OFFICE and WYNDHAM HOTEL

All mechanical and electrical works of offices, shoppping mall, hotel and carpark. Total indoor area of 322.000 m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2015

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

SEHRIZAR RESIDENCES

All mechanical works of the residences, community center and carpark of 102.900 m² indoor area

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2013

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT DENTAL HOSPITAL

Mechanical works of hospital specialized in dental. Area of 16.000m²

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2013

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

ASHGABAT OPHTHALMOLOGY HOSPITAL

Mechanical works of hospital specialized in Ophthalmology area of 16.000m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2012

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

BAHADIR İNŞAAT

AKASYA RESIDENCES

All mechanical works of apartments, residances and carparks. Total indoor area of 97.000m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2009

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

ASAŞ ALÜMİNYUM VE SANAYİ TİCARET A.Ş.

ASAS ALUMINIUM PRODUCTION FACTORY EXTENTION

Heating, cooling and processing works of electroliquid tanks (90-70 heating installations, superheated water cooling,compressed air and process installations)

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2013

Scope: General Contracting

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

TURKMENBASHI ONSHORE GAS TERMINAL

Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.

Status: Completed

Location: Enfidha / Tunusıa

Year: 2010

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TAV TEPE AKFEN YATIRIM İNŞAAT VE İŞLETME A.Ş.

TUNUSIA ENFIDHA ZINE EL ABIDINE BEN ALI INTERNATIONAL AIRPORT

Mechanical works of terminal, air traffic control and auxillary buildings. Mechanical systems, electrical installation works. Total indoor area of 130.000m²

Status: Completed

Location: Istanbul / türkiye

Year: 2009

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

KOZKEN İNŞAAT TAAHHÜT TURİZM A.Ş.

PALLADIUM SHOPPING MALL AND RESIDENCES

Mechanical works of shopping center, carpark and residance buildings. Total indoor area of 20.000²

Status: Completed

Location: Kocaeli / Türkiye

Year: 2009

  • Civil
  • Mechanical
  • Electrical
  • Finishing
  • Landscaping

 

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

SAPANCA LAKE - YUVACIK WASTE WATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS

Kocaeli / Türkiye

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2008

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

KYP INDOOR SWIMMING POOL FACILITY

HVAC, sanitation, fire and BMS works. Total area 30.000m²

Status: Completed

Location: Ankara / Türkiye

Year: 2011

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TURKIYE ODALAR VE BORSALAR BİRLİĞİ

TOBB TWIN TOWERS

Mechanical restoration of 2 32-floor towers. Total indoor area of 160.000m² 

Status: Completed

Location: Istanbul / Türkiye

Year: 2009

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

TRUMP SHOPPING MALL AND CARPARK

Project consist of a 62.000 m² shopping mall and a carpark with the capacity of 1000 cars.

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

NATIONAL LIBRARY AND CULTURAL CENTER OF TURKMENISTAN

Mechanical works of library, museum and concert hall buildings. 
Total indoor area of 55.000m²

Status: Completed

Location: Kocaeli / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

POAŞ TERMINAL FACILITIES - KOCAELİ

Construction of cylindirical tanks; piping works of fuel and fire lines, restorations of existing manifolds

Status: Completed

Location: Antalya / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

POAŞ TERMINAL FACILITIES - ANTALYA

Construction of cylindirical tanks; piping works of fuel and fire lines, restorations of existing manifolds

Status: Completed

Location: Istanbul / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

POAŞ TERMINAL FACILITIES - İSTANBUL

Construction of cylindirical tanks; piping works of fuel and fire lines, restorations of existing manifolds

Status: Completed

Location: İzmir / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

POAŞ TERMINAL FACILITIES - İZMİR

Construction of cylindirical tanks; piping works of fuel and fire lines, restorations of existing manifolds

Status: Completed

Location: Erzurum / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

POAŞ TERMINAL FACILITIES - ERZURUM

Construction of cylindirical tanks; piping works of fuel and fire lines, restorations of existing manifolds

Status: Completed

Location: Ashgabat / Türkmenistan

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş.

UAE EMBASSY BUILDING

Mechanical works of embassy and lodging buildings. Total indoor area of 6.500m²

Status: Completed

Location: Arbıl / Iraq

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

MAKYOL INŞAAT A.Ş.

HAWLER AIRPORT JET FUEL FARM

Construction of two 1.000m³ tanks and pumping station
HAWLER AIRPORT JET FUEL STORAGE AND TRANSPORT FACILITIES 

Status: Completed

Location: Istanbul / Türkiye

Year: 2007

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

TAKSİT CENTER SHOPPING CENTER

AIR CONDITIONING,HEATING,COOLING,FIRE FIGHTING SYSTEM,BUILDING AUTOMATION,NATURAL GAS.Total area 150.000m²

Status: Completed

Location: Istanbul / Türkiye 

Year: 2006

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

HÜSEYİN KALKAVAN İNŞAAT

ECE PLAZA – VODAFONE ISTANBUL HQ

HVAC, sanitation, fire and BMS works. Total area 30.000m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2003

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

DOĞAN MEDIA CENTER

HVAC, sanitation, fire protection, BMS installations, electrical works. Total area 20.000m²

Status: Completed

Location: Astana / Kazakistan

Year: 2006

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TOO CEYLAN LTD.

KAZAKHSTAN PRIME MINISTRY BUILDING

HVAC, sanitation, fire protection, BMS, compressed air installations

Status: Completed

Location: Ankara / Türkiye

Year: 2005

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TÜRK TIPSAN A.Ş.

SERUM PRODUCTION PLANT PARENTERAL SOLÜSYONLAR ÜRETİM TESİSİ

All mechanical, construction and electrical works of the factory, supply and installation of equipments. Total indoor area of 15.000m² consisting of 1.200m² hygenic area. Steam works and installations (4.000 kg/h ,8 bar), compressed air installations (6m³/min, 8 bar), installations of demineralization and recers osmosis system. HVAC, sanitation, fire protection and waste water process.

Status: Completed

Location: Astana / Kazakistan

Year: 2004

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

TOO CEYLAN LTD.

EURASIA UNIVERSITY

HVAC, sanitation, fire, BMS, compressed air installations. Total indoor area of 20.000m² (Mechanical and Electrical Works)

Status: Completed

Location: Istanbul / Türkiye

Year: 2003

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

TEKFEN HOLDING A.Ş.

TEKFEN TOWER

Mechanical works of office building and carparks.Total indoor area of 80.000m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2001

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

T. VAKIFLAR BANKASI T.A.O

T. VAKIFLAR BANK ISTANBUL CENTRAL BUILDING

20.000 m2 office building all mechanical installation works

Status: Completed

Location: Istanbul / Türkiye

Year: 2002

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

KARAMANCILAR HOLDING

KARDENIM TEXTILE, DENIM FACTORY

Mechanical works of Blue jean washing and abrasion facility (compressed air 12m³/min, 12 bar. Steam system 9.000kg/h, 8 bar. Heat Recovery System, waste water process and water process units, 200g/h ozone generator.

Status: Completed

Location: Ankara / Türkiye

Year: 2006

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

ULUSAL İNŞAAT LTD.ŞTİ.

REPUBLIC OF TURKEY PRIME MINISTRY BUILDING

Mechanical restoration of 2 32-floor towers. Total indoor area of 160.000m² 

Status: Completed

Location: Istanbul / Türkiye

Year: 2003

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

HÜSEYİN KALKAVAN İNŞAAT SAN. VE TİC. A.Ş.

MUSTAFA NEVZAT PHARMACEUTICAL FACTORY

HVAC, sanitation, fire protection installations. Total area of 22.000m²

Status: Completed

Location: Istanbul / Türkiye

Year: 2001

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

 

ATA FİLM STÜDYALARI A.Ş.

ATA FILM STUDIOS

Mechanical Works

Status: Completed

Location: Istanbul / Türkiye

Year: 2000

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

D- YAPI İNŞAAT SANAYİ VE TİCARET A.Ş.

MİLLİYET HEADQUARTERS

Mechanıcal Works

Status: Completed

Location: Istanbul / Türkiye

Year: 2000

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

MIGROSTURK A.Ş.

MİGROS SHOPPING MALLS

Mechanical Works

Devam Eden Projeler

Tüm Projeler

Anahtar Teslim Projeler