REFERENCE DETAIL

RIYADH KING KHALED INTERNATIONAL AIRPORT T1-2 TERMINALS

Riyadh / Saudi Arabia

RIYADH KING KHALED INTERNATIONAL AIRPORT T1-2 TERMINALS
RIYADH KING KHALED INTERNATIONAL AIRPORT T1-2 TERMINALS

Project Overview


All MEP works of King Khaled International Airport Terminal 1 and Terminal 2 along with the linking buildings, in Riyadh, the capital of the Kingdom of Saudi Arabia.

Details


Status: Ongoing

Location: Riyadh / Saudi Arabia

Year: 2025

Scope: MEP

  • HVAC
  • Plumbing
  • Firefighting
  • BMS
  • LV
  • MV

 

JOINT VENTURE OF AL RASHID TRADING AND CONTRACTING COMPANY AND IC ICTAS SAUDI ARABIA LIMITED

Ongoing

MEP

Transportation

Saudi Arabia

2025

Similar Projects

sonmez-brand

Contact Us

Business İstanbul A Blok Floor 18, D:180 34732 Kadıköy/İstanbul

+90 216 515 60 00

sonmez@sonmezglobal.com

TTR Bilişim Hizmetleri


© 2023 Sönmez Global. All Rights Reserved.