TURKMENBASHI ONSHORE GAS TERMINAL
Ashgabat / Türkmenistan
Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.
Status: Completed Location: Ashgabat / Türkmenistan Year: 2013 Scope: MEP
|
GAP İNŞAAT YATIRIM VE DIŞ TİCARET A.Ş. |
Completed
MEP
Industrial
Turkmenistan
2013