KOCAELİ FORD OTOSAN B460 YENİKÖY FACTORY
All mechanical work, including welding facility, assembly facility, painting facility, and auxiliary structures.
TURKMENBAŞI ONSHORE GAS TERMINAL
Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.
ASAS ALUMINUM PRODUCTION FACILITY EXPANSION
Heating, cooling and processing works of electroliquid tanks (90-70 heating installations, superheated water cooling,compressed air and process installations)
SAPANCA LAKE – YUVACIK WASTEWATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS
Installation of 21 km of 1,300 mm diameter pipe, construction of a pump station, construction of a water reservoir with a capacity of 2,000 m³ and a flow rate of 600 l/s, water intake structure, supply of a 1,250 kW pump, and...
POAŞ TERMINAL FACILITIES (KOCAELİ/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ANTALYA/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ISTANBUL/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (IZMIR/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
POAŞ TERMINAL FACILITIES (ERZURUM/TURKEY)
Construction and erection of cylindrical tanks; piping work for fuel and fire lines, repair of existing distribution lines
KTU Stem Cell Laboratory
Heating, ventilation, plumbing, fire protection, and building management systems (BMS) work. Total area 16,000 m².