Ashgabat Eye Hospital
Mechanical installation works for a specialized Ophthalmology hospital with a total enclosed area of 15,000 m².
TURKMENBAŞI ONSHORE GAS TERMINAL
Installations of 6.000 metric tons of piping, 5.300 metric tons of steel structures; electrical and instrument works of processes and various installations within 18.000m² indoor area.
AKASYA RESIDENCES
All mechanical work for apartments, residences, and parking lots. Total indoor area: 97,000 m².
TOBB Twin Towers
Mechanical restoration of two 32-story towers. Total indoor area of 160,000 m².
TURKMENISTAN MAIN HOSPITAL
All mechanical works of 15.000 m² hospital with 60 beds
TUNISIA ENFIDHA ZINE EL ABIDINE BEN ALI INTERNATIONAL AIRPORT
Mechanical works for the terminal, air traffic control, and auxiliary buildings. Mechanical systems, electrical installation works. Total indoor area 130,000 m².
MARKOVO TEPE MALL
The turnkey shopping center construction was carried out as the main contractor.
ASAS ALUMINUM PRODUCTION FACILITY EXPANSION
Heating, cooling and processing works of electroliquid tanks (90-70 heating installations, superheated water cooling,compressed air and process installations)
PALLADIUM SHOPPING MALL & RESIDENCES
Mechanical works of shopping center, carpark and residance buildings. Total indoor area of 20.000 m²
SAPANCA LAKE – YUVACIK WASTEWATER TREATMENT PLANT CONSTRUCTION AND SURROUNDING PUMPING STATIONS
Installation of 21 km of 1,300 mm diameter pipe, construction of a pump station, construction of a water reservoir with a capacity of 2,000 m³ and a flow rate of 600 l/s, water intake structure, supply of a 1,250 kW pump, and...















